HomeProjectDevelopment Project
DEVELOPMENT PROJECT HISTORY
- Development of a market analysis program linked to a new computer model
- Period 2021.12.06~2022.06.06
- Client Korea Power Exchange
-
Contents
- Development of PLEXOS and PROD data analysis programs
- Implementation of technical characteristics, cost data, and power generation plan results input functions for each generator
- Implementation of a function to calculate the amount of emission by power generator and power source based on the power generation stage
- The 2021 Power Market Comprehensive Analysis System (MTAS) maintenance service
- Period 2021.08.09~2021.12.31
- Client KEPCO KDN
-
Contents
- Korea Electric Power Corporation Power Market Analysis System (MTAS) Maintenance (2021))
- Power generation plan input/output program (RSCT) improvement service
- Period 2021.07.26~2022.05.25
- Client Korea Power Exchange
-
Contents
- Improvement of RSCT program to introduce a daily exhibition market based on real-world systems
- Improving the UI for integrated management of constraints to improve the convenience of information disclosure
- Change the model for establishing a development plan for each period and link data for each period
- Power Transaction Support System (ETS) improvement service related to bidding system change
- Period 2021.07.01~2021.10.01
- Client Korea District Heating Corporation
-
Contents
- Additional development of the Electric Power Transaction Support System (ETS) following the revision of the Electric Power Market Operation Rules
- Implementation of additional functions in bidding for new bidding items and technical characteristics data
- Integrated Power Transaction Prediction System
- Period 2021.06.09 ~ 2021.10.07
- Client Korea Western Power
-
Contents
- Establishing and customizing an integrated power market prediction system
- Long-term and short-term power market prediction solution
- Integrated Operational Development Plan (UC) System Maintenance Consignment Service
- Period 2020.12.21~2021.12.20
- Client Korea Power Exchange
-
Contents
- Integrated Operational Development Plan (UC) System Maintenance
- New Power Market Outlook System
- Period 2020.12.19 ~ 2021.05.28
- Client Korea East-West Power
-
Contents
- Establishing and customizing a new power market outlook system
- Long-term and short-term power market prediction solution
- Development of a module for optimizing the operation of various types of energy
- Period 2020.10.15~2022.02.15
- Client KEPCO Electric Power Research Institute
-
Contents
- Development of P2G-based multi-MG power transaction optimal operation and cluster control system
- Implementation of a web application system that integrates data management and analysis functions
- Power market monitoring and analysis system development
- Period 2020.08.31~2021.11.30
- Client KEPCO Electric Power Research Institute
-
Content
- Power Market Analysis System (MTAS) Web System Redevelopment and Integrated Linkage
- Establishment of a power market data management system and monitoring system
- Development of prediction error analysis system/pharmaceutical cost analysis system
- A project to develop a program to review the stability of the electricity system
- Period 2020.08.31~2021.08.30
- Client Korea Power Exchange
-
Contents
- Development of a review support program linked to a system analysis program (PSS/E) (Python)
- Bird calculation, fault current/normal fault analysis, and automation function of transient simulation are implemented
- RSC simulator development service
- Period 2020.06.24 ~ 2020.12.24
- Client Korea Power Exchange
-
Contents
- RSC input file management for simulation
- Optimization and reference planning automation
- Comparison of simulation results and generation of key indicator reports
- Next generation power market forecasting system maintenance service
- Period 2020.06.01 ~ 2022.05.31
- Client Korea Electric Power Knowledge Data Network Co., Ltd.
-
Contents
- Maintenance service for Korea Midland Power Co.,Ltd. Next generation power market forecasting system
- Power trading forecasting program (short-term, automation) purchasing service
- Period 2020.05.22 ~ 2020.11.23
- Client Korea District Heating Corp.
-
Contents
- Power market long/short-term forecasting solution
- Customization design (power market comprehensive analysis system)
- Realization of electric power trading system interlocking function
- Power market total analysis system(MTAS) maintenance service
- Period 2020.05.18 ~ 2020.12.31
- Client Korea Electric Power Knowledge Data Network Co., Ltd.
-
Contents
- Maintenance service for Korea Electric Power Corp. Power market total analysis system(MTAS)(2020)
- RSCT maintenance service
- Period 2019.11.25 ~ 2020.11.24
- Client Korea Power Exchange
-
Contents
- Maintenance service for Korea Power Exchange RSCT
- District electricity capacity charge additional electric power trading system improvement service
- Period 2019.11.27 ~ 2020.05.26
- Client Korea District Heating Corp.
-
Contents
- Development of a bidding and settlement system according to the bidding for the regional electric generator
- Centralized power generator ERP accounting processing advancement and ETS linkage function development
- Implementation of additional functions such as other ETS design improvements
- Power trading market price prediction program development service
- Period 2019.06.24 ~ 2019.10.23
- Client Korea Hydro & Nuclear Power Co.,Ltd.
-
Contents
- Power market long/short-term forecasting solution
- Customization design (power market comprehensive analysis system)
- Power market total analysis system(MTAS) maintenance service
- Period 2019.05.10 ~ 2019.12.31
- Client Korea Electric Power Knowledge Data Network Co., Ltd.
-
Contents
- Maintenance service for Korea Electric Power Corp. Power market total analysis system(MTAS)(2019)
- Integrated operation development planning system construction service
- Period 2018.09.14 ~ 2020.09.13
- Client Korea Power Exchange
-
Contents
- System development for real-time operating system change and sequential establishment
- Development of optimization engine for weekly development plan (WAUC), day before day development plan (DAUC), daytime development plan (OPUC), real time development plan (RTUC), exception processing development plan (EXUC)
- Installation service of communication equipment for comparison of weighing data of central feed generator
- Period 2018.10.10 ~ 2018.11.23
- Client Korea District Heating Corp.
-
Contents
- Establishment of communication equipment for acquisition of comparative weighing data of central feed generators
- Development of real-time acquisition module for comparative weighing data of central feed generator
- Real time estimating function of EMS East-West Sea coast generator
- Period 2018.06.19 ~ 2018.12.18
- Client Korea Power Exchange
-
Contents
- Actual application of electric power system operation system (EMS) in the research project "Study on automation method of real-time calculation of generator capacity of the east-west coast using EMS system analysis function"
- Review real-time systems and components in the PSS/E analysis engine and EMS system
- Application of redundancy solution of system
- Next Generation Development Plan and Power Market Forecasting System
- Period 2018.04.06 ~ 2018.10.05
- Client Korea Midland Power Co.
-
Contents
- Power market short-term forecasting solution
- Customization design (power market comprehensive analysis system)
- Performance Improvement of I / O Program (RSCT) for Power Generation Plan
- Period 2018.01.29 ~ 2018.10.28
- Client Korea Power Exchange
-
Contents
- Pricing, Operations, Weekly Development Planning I / O Program Integration and Performance Improvements
- Add GT / ST, hydraulic / pumping separation function for market change
- Simulator for integrated power generation planning and power market analysis
- Period 2018.01.10
- Client Korea Power Exchange
-
Contents
- Development of M-Core short-term GT / ST, hydraulic / pumping separation simulation function
- Development of individual GT / ST, hydraulic / pumping bid data generation function using MSYS
- Development of M-Core DB generation function for simulation of GT / ST and hydraulic / pumping using MSYS
- Improvement of power trading system for adding district electricity accounting process
- Period 2017.11.27 ~ 2018.06.26
- Client Korea District Heating Corp.
-
Contents
- Developed the function of linking the power trading system and the accounting processing system (ERP SAP)
- Build Web service (REST) server and client according to security policy
- Adding and improving power trading system functions
- Next-generation power generation and power market prediction system
- Period 2017.02.22 ~ 2017.06.23
- Client Korea Midland Power Co.
-
Contents
- Power market long/short-term forecasting solution
- Customization design (power market comprehensive analysis system)
- Development of urban energy supply optimal design and simulation simulator
- Period 2016.10.26 ~ 2019.04.25
- Client Korea Electric Power Corp.
-
Contents
- Development of energy supply planning simulation system for Smart Energy City
- Development of electricity trading simulation system for energy resource trading of Smart Energy City
- Development of multi-channel power meter user and manager interface
- Period 2016.05.09 ~ 2016.07.15
- Client Korea Testing Laboratory
-
Contents
- Development of a UI for Multi-Channel Watt-hour Metering in the Demonstration Complex
- Development of real-time monitoring program for monitoring operation status of multi-channel watt hour meter and acquisition of weighing data
- Demand Response Market Participation Modeling Analysis Research
- Period 2016.05.01 ~ 2016.09.30
- Client Korea Railroad Research Institute
-
Contents
- Domestic demand resource market analysis
- Economic analysis of railroad power load
- To derive optimal strategy for railway power load
- Effective linkage between energy storage devices and distributed power sources
- EMS generator Unit Commitment prototype
- Period 2016.04.25 ~ 2016.10.25
- Client Korea Electric Research Institute
-
Contents
- Advanced NA development for EMS
- KERI joint research project modeling and monitoring function development
- Period 2016.04.20 ~ 2016.12.20
- Client LSIS
-
Contents
- Power System Modeling for Performance Evaluation of generation scheduling program
- Power system generation/load distribution function
- Power system operation data generation function
- AGC/ED Application Evaluation Function
- AGC/ED Application Code Inspection
- Measuring and recalculating line constants of low-voltage power distribution system
- Period 2016.03.01 ~ 2018.01.31
- Client Korea Testing Laboratory
-
Contents
- Perform test on line coefficient of line low-voltage line
- Developed statistical analysis tool for low-voltage system operation data
- Development of Reliability-Based Transmission Tower Deterioration Evaluation Method
- Period 2016.02.22 ~ 2017.01.21
- Client KEPCO KPS
-
Contents
- Influential Factor Classification for Iron Tower Weighting (Degradation Degree, Importance of Power System, Environmental Elements)
- Development of a steel tower maintenance weighting algorithm
- Application of steel tower maintenance weighting algorithm on site
- Development of pseudo program with proposed maintenance weighting
- Overseas type DMS distribution simulator MMI commissioned development
- Period 2015.10.13 ~ 2015.12.31
- Client LSIS
-
Contents
- Development of man-machine interface related to distribution system simulation
- Long-term operation history analysis function
- Period 2015.09.22 ~ 2015.12.11
- Client LSIS
-
Contents
- Supplementing ESS control functions
- Development of long-term history analysis function
- Site site support for long-term historical analysis
- Development of separate functions for power trading support system by authority
- Period 2015.08.03 ~ 2015.10.02
- Client Pyungtaek Energy service ltd.
-
Contents
- Separate functions to enable the main functions of the power trading support system to be used separately according to the user's authority
- Implementation of water pipe network optimization and test bed verification
- Period 2015.07.16 ~ 2015.12.15
- Client LSIS
-
Contents
- Implementation of I / F function of SCADA_PAS water network optimal operating client screen and MILP (Mixed Integer Linear Programming) engine input / output
- Implement I / F function of Oracle history DB, EPANET DB and MILP engine
- Implement input / output I / F function between EPANET and MILP engine
- Development of MILP engine for optimal pump ON-OFF design
- Develop software testing tool to secure safety of large-scale power system application
- Period 2015.07.01 ~ 2016.06.30
- Client Small and Medium Business Administration
-
Contents
- Developed SW to test SW reliability and algorithm accuracy to be used in the development process of power IT software
- Development of Environment Management Tool for SCADA-PAS Platform Integrated System
- Period 2015.04.08 ~ 2015.07.31
- Client LSIS
-
Contents
- SCADA-PAS platform provides functions to integrate and manage various configuration files for system configuration, installation, and start-up
- Provides the function to add / delete / edit system setting items and change necessary system setting values on SCADA-PAS platform
- Establish EES operational strategy for frequency adjustment
- Period 2015.03.09 ~ 2015.05.29
- Client LSIS
-
Contents
- Development of AGC / GF function
- Development of battery output distribution function
- Battery modeling
- PID controller development
- The necessity of battery operation function reflecting battery deterioration
- Economic evaluation of train station energy use and development of response function for demand response
- Period 2015.02.27 ~ 2015.08.31
- Client Korea Railroad Research Institute
-
Contents
- Load blocking / recovery program
- Analysis of economic feasibility and possibility as 'demand response resource' of railroad load
- Power market comprehensive analysis system MTAS Advanced package SW 4 types
- Period 2015.01.07 ~ 2015.10.04
- Client Korea Electric Power Corp.
-
Contents
- Short-term/Long-term DC-OPF
- Power system information (PSS / E form) and electricity market information linkage and integration
- Development of optimization model for application of water distribution network
- Period 2014.11.07 ~ 2015.03.30
- Client LSIS
-
Contents
- Prototype program development and verification using the proposed algorithm for the target system
- Developed the optimum operation program for water pipe pump and valve
- Power Quality System Migration
- Period 2014.10.28 ~ 2014.12.30
- Client LSIS
-
Contents
- Data conversion processing received from the power quality meter
- Power quality HMI S/W conversion to Active/X development
- Electric power trading support system construction
- Period 2014.09.03 ~ 2015.05.15
- Client Korea District Heating Corporation
-
Contents
- Implementation of optimal system with latest technology applied to metering, bidding and settlement in conjunction with next-generation system construction of KPX
- User-friendly system by improving usability
- Information security and stability secured system construction
- Development of market-linked operation function
- Period 2014.03.24 ~ 2014.11.28
- Client LSIS
-
Contents
- Development and comparison of bidding / settlement results for frequency adjustment service of large-scale ESS participating in frequency adjustment market
- Developed an algorithm that optimally controls multiple parallel-connected ESS according to AGC commands
- Supplement of operating system (4MW system for ESS frequency tuning)
- Period 2014.02.26 ~ 2014.05.09
- Client LSIS
-
Contents
- Development of stop-start plan (UC), economic dispatch (ED), automatic power generation control (AGC), and demand response (DR)
- Create design documents and perform functional tests
- Development of PMS basic operation function for customers
- Period 2014.02.01 ~ 2014.09.30
- Client LSIS
-
Contents
- Establishment of PMS in building ESS (Load leveling, Peak shaving, demand response function)
- Development of OTS function for DCC FAT response in Iraq
- Period 2014.01.20 ~ 2014.06.15
- Client LSIS
-
Contents
- Development and Englishization of Iraq Operation Training System (OTS)
- Developed simulator function for SAT compliance in next generation EMS task
- Period 2014.01.20 ~ 2014.08.15
- Client LSIS
-
Contents
- Consider the ram-rate up/down in the dynamic model of generator
- Time acquisition of frequency acquisition device
- FAT complementary development of next generation EMS simulator function
- Period 2013.09.12 ~ 2013.12.12
- Client LSIS
-
Contents
- SVC modeling, relay modeling
- HVDC modeling and implementation
- Developed wind farm simulator
- Period 2013.09.01 ~ 2014.08.31
- Client Chon-Buk National Univ.
-
Contents
- A simulator for calculating the effective wind speed per hour input into individual wind turbines constituting a large-scale wind farm
- SK E&S IDSS M-Core speed improvement project
- Period 2013.09.01 ~ 2013.12.31
- Client SK E&S
-
Contents
- Development of multiple simulation function of web-based development plan program and improvement of simulation speed
- SK E&S Electricity Trading Support System
- Period 2013.07.01 ~ 2013.11.30
- Client SK E&S
-
Contents
- Development of web-based power management system for efficient power trading business
- Support bidding and settlement business in connection with KPX
- Iraq DCC load blocking and simulated load generation scenario function development
- Period 2013.06.18 ~ 2014.02.18
- Client LSIS
-
Contents
- Development of load blocking system (Peak shaving / Frequency tracking / Manual mode)
- External system modeling
- Developed next generation EMS Unit Commitment
- Period 2013.05.06 ~ 2013.08.05
- Client Korea Electric Research Institute
-
Contents
- Develop generation scheduling program to be included in next generation EMS and implement related UI
- Comprehensive Analysis System Tool for Electric Power Market
- Period 2012.12.18 ~ 2013.05.16
- Client Korea Electric Power Corp.
-
Contents
- RSC execution engine interworking module
- KPX / PTS real-time data linkage and data verification function
- Integrated data DB and UI integration management
- Development of special generators and special facilities for next generation EMS DTS
- Period 2012.10.01 ~ 2013.05.31
- Client LSIS
-
Contents
- Dynamic modeling and implementation of photovoltaic / wind / diesel / pumped generators
- Modifying a Hydraulic Generator Model
- SPS system
- Development of pre-settlement system and integrated bidding to power market
- Period 2012.07.01 ~ 2012.09.30
- Client LSIS
-
Contents
- Development of pre-settlement system of micro grid
- Development of bidding function for generation resources of the market
- Development of optimal operation function of real-time energy storage device
- Period 2012.06.01 ~ 2012.10.31
- Client LSIS
-
Contents
- Establish real-time operation plan (ED and AGC) considering battery and heat storage tank in micro grid
- Development of DR-UI program for users and managers of power demand resource trading system
- Period 2012.02.01 ~ 2012.03.31
- Client Byucksan Power., ltd.
-
Contents
- Development of I/O management program for web-based daily market optimization
- Establishment of optimal decision support system(IDSS)
- Period 2011.10.01 ~ 2012.05.31
- Client SK E&S
-
Contents
- Development of SMP prediction system among optimal decision support system
- Establishment of web-based development plan program reflecting the requirements of SK E&S
- Development of optimal operation plan of low-cost energy storage device
- Period 2011.08.22 ~ 2011.11.30
- Client LSIS
-
Contents
- Establish optimal operation plan considering battery and heat storage tank in micro grid
- Development of optimum operation plan using commercial optimization solver and open optimization solver
- Development of LA Client which includes ADR component module
- Period 2011.05.16 ~ 2011.08.31
- Client Byucksan Power., ltd.
-
Contents
- Planning of a DR program interlocking system scenario and designing of the related user interface for LA Client.
- Development of LA client
- Development of the system for CBL Data collection and analysis
- Period 2011.05.16 ~ 2011.08.31
- Client Byucksan Power., ltd.
-
Contents
- Designing the system for CBL calculation and analysis in conjunction with the operation system of real-time load resource.
- Applying various CBL calculation methods and analysis of DR effect based on differences due to the various CBS calculation methods.
- Planning of a power trade system scenario and designing of the user interface
- Period 2011.03.14 ~ 2011.07.13
- Client Byucksan Power., ltd.
-
Contents
- Planning of an operation system scenario for the real-time load resource.
- Planning and designing of the related user interface
- Development of an optimized operation model for the smart renewable storage device
- Period 2010.11.01 ~ 2011.04.30
- Client LSIS
-
Contents
- Development of an optimized operation model engine for the renewable facilities running in Jeju Smart Grid Test-bed
- TAG DB management program
- Period 2010.10.01 ~ 2010.12.31
- Client Korea Power Exchange
-
Contents
- Development of TAG DB management program
- Developed Optimum Power Generation Plan Solution
- Period 2010.08.01 ~ 2011.01.31
- Client LSIS
-
Contents
- Establishment of optimum UC considering generation facility and heat production facility in micro grid
- Minimize cost and maximize profits considering network connection
- Designed related UI
- Development of an integrated operation system for Korean District Heating Corp.
- Period 2010.04.15 ~ 2010.08.30
- Client Korean District Heating Corp.
-
Contents
- Development of an optimization engine to forecast the power market output and SMP
- Development of the web-based user interface to maximize user convenience
- Designing of the virtual power market for the business promotion of Smart Grid Test-bed
- Period 2010.04.01 ~ 2012.03.31
- Client Korea Electrotechnology Research Institute
-
Contents
- Designing of the day-ahead market for Jeju Smart Grid Test-bed
- Development of an optimization engine to run the day-ahead market
- Development of an optimization function device for TOC connected power market
- Period 2010.02.01 ~ 2011.05.15
- Client LSIS
-
Contents
- Development of an optimization engine focused on the market of Jeju Smart Grid Test-bed
- Development of an integrated operation system for Korean District Heating Corp.
- Period 2009.11.10 ~ 2010.08.25
- Client Korean District Heating Corp.
-
Contents
- Development of an optimization engine to forecast the power market output and SMP
- Development of the web-based user interface to maximize user convenience
- Development of an integrated computer model for generation scheduling and transaction analysis for the Korean power market
- Period 2009.10.01 ~ 2010.09.30
- Client Korea Southern Power Co., Ltd.
-
Contents
- Development of a generation scheduling program in conjunction with load forecasting
- Offers a short-term model based upon MIP and a long-term model based upon SUDP
- Offers customization such as a simultaneous scenario execution function based on user request
- Renovation of integrated system for power supply and demand
- Period 2009.03.26 ~ 2009.09.25
- Client Korea Power Exchange
-
Contents
- Development of HITES
- Forecasting the amount of fuel consumption and the generation cost by setting up monthly to yearly generation scheduling
- Offers a function to modify maintenance schedule in conjunction with reserved power
- Designing of an operation screen for the economic dispatch in Micro Grid
- Period 2009.02.16 ~ 2009.08.15
- Client LSIS
-
Contents
- Designing of an operation screen for the economic dispatch in Micro Grid operation system
- Development of an operation algorithm for economic dispatch and automatic control in Micro Grid
- Period 2009.02.16 ~ 2009.08.15
- Client LSIS
-
Contents
- Offering the optimized resource distribution reflecting power demand and heat demand within Micro Grid
- Automatic execution of ED based upon the duration set up by user
- Providing an option of profit maximization module in conjunction with minimizing generation cost and network connectivity