HomeProjectDevelopment Project

DEVELOPMENT PROJECT HISTORY

2021year
Development of a market analysis program linked to a new computer model
Period 2021.12.06~2022.06.06
Client Korea Power Exchange
Contents
  • Development of PLEXOS and PROD data analysis programs
  • Implementation of technical characteristics, cost data, and power generation plan results input functions for each generator
  • Implementation of a function to calculate the amount of emission by power generator and power source based on the power generation stage
The 2021 Power Market Comprehensive Analysis System (MTAS) maintenance service
Period 2021.08.09~2021.12.31
Client KEPCO KDN
Contents
  • Korea Electric Power Corporation Power Market Analysis System (MTAS) Maintenance (2021))
Power generation plan input/output program (RSCT) improvement service
Period 2021.07.26~2022.05.25
Client Korea Power Exchange
Contents
  • Improvement of RSCT program to introduce a daily exhibition market based on real-world systems
  • Improving the UI for integrated management of constraints to improve the convenience of information disclosure
  • Change the model for establishing a development plan for each period and link data for each period
Power Transaction Support System (ETS) improvement service related to bidding system change
Period 2021.07.01~2021.10.01
Client Korea District Heating Corporation
Contents
  • Additional development of the Electric Power Transaction Support System (ETS) following the revision of the Electric Power Market Operation Rules
  • Implementation of additional functions in bidding for new bidding items and technical characteristics data
Integrated Power Transaction Prediction System
Period 2021.06.09 ~ 2021.10.07
Client Korea Western Power
Contents
  • Establishing and customizing an integrated power market prediction system
  • Long-term and short-term power market prediction solution
2020year
Integrated Operational Development Plan (UC) System Maintenance Consignment Service
Period 2020.12.21~2021.12.20
Client Korea Power Exchange
Contents
  • Integrated Operational Development Plan (UC) System Maintenance
New Power Market Outlook System
Period 2020.12.19 ~ 2021.05.28
Client Korea East-West Power
Contents
  • Establishing and customizing a new power market outlook system
  • Long-term and short-term power market prediction solution
Development of a module for optimizing the operation of various types of energy
Period 2020.10.15~2022.02.15
Client KEPCO Electric Power Research Institute
Contents
  • Development of P2G-based multi-MG power transaction optimal operation and cluster control system
  • Implementation of a web application system that integrates data management and analysis functions
Power market monitoring and analysis system development
Period 2020.08.31~2021.11.30
Client KEPCO Electric Power Research Institute
Content
  • Power Market Analysis System (MTAS) Web System Redevelopment and Integrated Linkage
  • Establishment of a power market data management system and monitoring system
  • Development of prediction error analysis system/pharmaceutical cost analysis system
A project to develop a program to review the stability of the electricity system
Period 2020.08.31~2021.08.30
Client Korea Power Exchange
Contents
  • Development of a review support program linked to a system analysis program (PSS/E) (Python)
  • Bird calculation, fault current/normal fault analysis, and automation function of transient simulation are implemented
RSC simulator development service
Period 2020.06.24 ~ 2020.12.24
Client Korea Power Exchange
Contents
  • RSC input file management for simulation
  • Optimization and reference planning automation
  • Comparison of simulation results and generation of key indicator reports
Next generation power market forecasting system maintenance service
Period 2020.06.01 ~ 2022.05.31
Client Korea Electric Power Knowledge Data Network Co., Ltd.
Contents
  • Maintenance service for Korea Midland Power Co.,Ltd. Next generation power market forecasting system
Power trading forecasting program (short-term, automation) purchasing service
Period 2020.05.22 ~ 2020.11.23
Client Korea District Heating Corp.
Contents
  • Power market long/short-term forecasting solution
  • Customization design (power market comprehensive analysis system)
  • Realization of electric power trading system interlocking function
Power market total analysis system(MTAS) maintenance service
Period 2020.05.18 ~ 2020.12.31
Client Korea Electric Power Knowledge Data Network Co., Ltd.
Contents
  • Maintenance service for Korea Electric Power Corp. Power market total analysis system(MTAS)(2020)
2019year
RSCT maintenance service
Period 2019.11.25 ~ 2020.11.24
Client Korea Power Exchange
Contents
  • Maintenance service for Korea Power Exchange RSCT
District electricity capacity charge additional electric power trading system improvement service
Period 2019.11.27 ~ 2020.05.26
Client Korea District Heating Corp.
Contents
  • Development of a bidding and settlement system according to the bidding for the regional electric generator
  • Centralized power generator ERP accounting processing advancement and ETS linkage function development
  • Implementation of additional functions such as other ETS design improvements
Power trading market price prediction program development service
Period 2019.06.24 ~ 2019.10.23
Client Korea Hydro & Nuclear Power Co.,Ltd.
Contents
  • Power market long/short-term forecasting solution
  • Customization design (power market comprehensive analysis system)
Power market total analysis system(MTAS) maintenance service
Period 2019.05.10 ~ 2019.12.31
Client Korea Electric Power Knowledge Data Network Co., Ltd.
Contents
  • Maintenance service for Korea Electric Power Corp. Power market total analysis system(MTAS)(2019)
Integrated operation development planning system construction service
Period 2018.09.14 ~ 2020.09.13
Client Korea Power Exchange
Contents
  • System development for real-time operating system change and sequential establishment
  • Development of optimization engine for weekly development plan (WAUC), day before day development plan (DAUC), daytime development plan (OPUC), real time development plan (RTUC), exception processing development plan (EXUC)
2018year
Installation service of communication equipment for comparison of weighing data of central feed generator
Period 2018.10.10 ~ 2018.11.23
Client Korea District Heating Corp.
Contents
  • Establishment of communication equipment for acquisition of comparative weighing data of central feed generators
  • Development of real-time acquisition module for comparative weighing data of central feed generator
Real time estimating function of EMS East-West Sea coast generator
Period 2018.06.19 ~ 2018.12.18
Client Korea Power Exchange
Contents
  • Actual application of electric power system operation system (EMS) in the research project "Study on automation method of real-time calculation of generator capacity of the east-west coast using EMS system analysis function"
  • Review real-time systems and components in the PSS/E analysis engine and EMS system
  • Application of redundancy solution of system
Next Generation Development Plan and Power Market Forecasting System
Period 2018.04.06 ~ 2018.10.05
Client Korea Midland Power Co.
Contents
  • Power market short-term forecasting solution
  • Customization design (power market comprehensive analysis system)
Performance Improvement of I / O Program (RSCT) for Power Generation Plan
Period 2018.01.29 ~ 2018.10.28
Client Korea Power Exchange
Contents
  • Pricing, Operations, Weekly Development Planning I / O Program Integration and Performance Improvements
  • Add GT / ST, hydraulic / pumping separation function for market change
Simulator for integrated power generation planning and power market analysis
Period 2018.01.10
Client Korea Power Exchange
Contents
  • Development of M-Core short-term GT / ST, hydraulic / pumping separation simulation function
  • Development of individual GT / ST, hydraulic / pumping bid data generation function using MSYS
  • Development of M-Core DB generation function for simulation of GT / ST and hydraulic / pumping using MSYS
2017year
Improvement of power trading system for adding district electricity accounting process
Period 2017.11.27 ~ 2018.06.26
Client Korea District Heating Corp.
Contents
  • Developed the function of linking the power trading system and the accounting processing system (ERP SAP)
  • Build Web service (REST) server and client according to security policy
  • Adding and improving power trading system functions
Next-generation power generation and power market prediction system
Period 2017.02.22 ~ 2017.06.23
Client Korea Midland Power Co.
Contents
  • Power market long/short-term forecasting solution
  • Customization design (power market comprehensive analysis system)
2016year
Development of urban energy supply optimal design and simulation simulator
Period 2016.10.26 ~ 2019.04.25
Client Korea Electric Power Corp.
Contents
  • Development of energy supply planning simulation system for Smart Energy City
  • Development of electricity trading simulation system for energy resource trading of Smart Energy City
Development of multi-channel power meter user and manager interface
Period 2016.05.09 ~ 2016.07.15
Client Korea Testing Laboratory
Contents
  • Development of a UI for Multi-Channel Watt-hour Metering in the Demonstration Complex
  • Development of real-time monitoring program for monitoring operation status of multi-channel watt hour meter and acquisition of weighing data
Demand Response Market Participation Modeling Analysis Research
Period 2016.05.01 ~ 2016.09.30
Client Korea Railroad Research Institute
Contents
  • Domestic demand resource market analysis
  • Economic analysis of railroad power load
  • To derive optimal strategy for railway power load
  • Effective linkage between energy storage devices and distributed power sources
EMS generator Unit Commitment prototype
Period 2016.04.25 ~ 2016.10.25
Client Korea Electric Research Institute
Contents
  • Advanced NA development for EMS
KERI joint research project modeling and monitoring function development
Period 2016.04.20 ~ 2016.12.20
Client LSIS
Contents
  • Power System Modeling for Performance Evaluation of generation scheduling program
  • Power system generation/load distribution function
  • Power system operation data generation function
  • AGC/ED Application Evaluation Function
  • AGC/ED Application Code Inspection
Measuring and recalculating line constants of low-voltage power distribution system
Period 2016.03.01 ~ 2018.01.31
Client Korea Testing Laboratory
Contents
  • Perform test on line coefficient of line low-voltage line
  • Developed statistical analysis tool for low-voltage system operation data
Development of Reliability-Based Transmission Tower Deterioration Evaluation Method
Period 2016.02.22 ~ 2017.01.21
Client KEPCO KPS
Contents
  • Influential Factor Classification for Iron Tower Weighting (Degradation Degree, Importance of Power System, Environmental Elements)
  • Development of a steel tower maintenance weighting algorithm
  • Application of steel tower maintenance weighting algorithm on site
  • Development of pseudo program with proposed maintenance weighting
2015year
Overseas type DMS distribution simulator MMI commissioned development
Period 2015.10.13 ~ 2015.12.31
Client LSIS
Contents
  • Development of man-machine interface related to distribution system simulation
Long-term operation history analysis function
Period 2015.09.22 ~ 2015.12.11
Client LSIS
Contents
  • Supplementing ESS control functions
  • Development of long-term history analysis function
  • Site site support for long-term historical analysis
Development of separate functions for power trading support system by authority
Period 2015.08.03 ~ 2015.10.02
Client Pyungtaek Energy service ltd.
Contents
  • Separate functions to enable the main functions of the power trading support system to be used separately according to the user's authority
Implementation of water pipe network optimization and test bed verification
Period 2015.07.16 ~ 2015.12.15
Client LSIS
Contents
  • Implementation of I / F function of SCADA_PAS water network optimal operating client screen and MILP (Mixed Integer Linear Programming) engine input / output
  • Implement I / F function of Oracle history DB, EPANET DB and MILP engine
  • Implement input / output I / F function between EPANET and MILP engine
  • Development of MILP engine for optimal pump ON-OFF design
Develop software testing tool to secure safety of large-scale power system application
Period 2015.07.01 ~ 2016.06.30
Client Small and Medium Business Administration
Contents
  • Developed SW to test SW reliability and algorithm accuracy to be used in the development process of power IT software
Development of Environment Management Tool for SCADA-PAS Platform Integrated System
Period 2015.04.08 ~ 2015.07.31
Client LSIS
Contents
  • SCADA-PAS platform provides functions to integrate and manage various configuration files for system configuration, installation, and start-up
  • Provides the function to add / delete / edit system setting items and change necessary system setting values on SCADA-PAS platform
Establish EES operational strategy for frequency adjustment
Period 2015.03.09 ~ 2015.05.29
Client LSIS
Contents
  • Development of AGC / GF function
  • Development of battery output distribution function
  • Battery modeling
  • PID controller development
  • The necessity of battery operation function reflecting battery deterioration
Economic evaluation of train station energy use and development of response function for demand response
Period 2015.02.27 ~ 2015.08.31
Client Korea Railroad Research Institute
Contents
  • Load blocking / recovery program
  • Analysis of economic feasibility and possibility as 'demand response resource' of railroad load
Power market comprehensive analysis system MTAS Advanced package SW 4 types
Period 2015.01.07 ~ 2015.10.04
Client Korea Electric Power Corp.
Contents
  • Short-term/Long-term DC-OPF
  • Power system information (PSS / E form) and electricity market information linkage and integration
2014year
Development of optimization model for application of water distribution network
Period 2014.11.07 ~ 2015.03.30
Client LSIS
Contents
  • Prototype program development and verification using the proposed algorithm for the target system
  • Developed the optimum operation program for water pipe pump and valve
Power Quality System Migration
Period 2014.10.28 ~ 2014.12.30
Client LSIS
Contents
  • Data conversion processing received from the power quality meter
  • Power quality HMI S/W conversion to Active/X development
Electric power trading support system construction
Period 2014.09.03 ~ 2015.05.15
Client Korea District Heating Corporation
Contents
  • Implementation of optimal system with latest technology applied to metering, bidding and settlement in conjunction with next-generation system construction of KPX
  • User-friendly system by improving usability
  • Information security and stability secured system construction
Development of market-linked operation function
Period 2014.03.24 ~ 2014.11.28
Client LSIS
Contents
  • Development and comparison of bidding / settlement results for frequency adjustment service of large-scale ESS participating in frequency adjustment market
  • Developed an algorithm that optimally controls multiple parallel-connected ESS according to AGC commands
Supplement of operating system (4MW system for ESS frequency tuning)
Period 2014.02.26 ~ 2014.05.09
Client LSIS
Contents
  • Development of stop-start plan (UC), economic dispatch (ED), automatic power generation control (AGC), and demand response (DR)
  • Create design documents and perform functional tests
Development of PMS basic operation function for customers
Period 2014.02.01 ~ 2014.09.30
Client LSIS
Contents
  • Establishment of PMS in building ESS (Load leveling, Peak shaving, demand response function)
Development of OTS function for DCC FAT response in Iraq
Period 2014.01.20 ~ 2014.06.15
Client LSIS
Contents
  • Development and Englishization of Iraq Operation Training System (OTS)
Developed simulator function for SAT compliance in next generation EMS task
Period 2014.01.20 ~ 2014.08.15
Client LSIS
Contents
  • Consider the ram-rate up/down in the dynamic model of generator
  • Time acquisition of frequency acquisition device
2014year
FAT complementary development of next generation EMS simulator function
Period 2013.09.12 ~ 2013.12.12
Client LSIS
Contents
  • SVC modeling, relay modeling
  • HVDC modeling and implementation
Developed wind farm simulator
Period 2013.09.01 ~ 2014.08.31
Client Chon-Buk National Univ.
Contents
  • A simulator for calculating the effective wind speed per hour input into individual wind turbines constituting a large-scale wind farm
SK E&S IDSS M-Core speed improvement project
Period 2013.09.01 ~ 2013.12.31
Client SK E&S
Contents
  • Development of multiple simulation function of web-based development plan program and improvement of simulation speed
SK E&S Electricity Trading Support System
Period 2013.07.01 ~ 2013.11.30
Client SK E&S
Contents
  • Development of web-based power management system for efficient power trading business
  • Support bidding and settlement business in connection with KPX
Iraq DCC load blocking and simulated load generation scenario function development
Period 2013.06.18 ~ 2014.02.18
Client LSIS
Contents
  • Development of load blocking system (Peak shaving / Frequency tracking / Manual mode)
  • External system modeling
Developed next generation EMS Unit Commitment
Period 2013.05.06 ~ 2013.08.05
Client Korea Electric Research Institute
Contents
  • Develop generation scheduling program to be included in next generation EMS and implement related UI
2012year
Comprehensive Analysis System Tool for Electric Power Market
Period 2012.12.18 ~ 2013.05.16
Client Korea Electric Power Corp.
Contents
  • RSC execution engine interworking module
  • KPX / PTS real-time data linkage and data verification function
  • Integrated data DB and UI integration management
Development of special generators and special facilities for next generation EMS DTS
Period 2012.10.01 ~ 2013.05.31
Client LSIS
Contents
  • Dynamic modeling and implementation of photovoltaic / wind / diesel / pumped generators
  • Modifying a Hydraulic Generator Model
  • SPS system
Development of pre-settlement system and integrated bidding to power market
Period 2012.07.01 ~ 2012.09.30
Client LSIS
Contents
  • Development of pre-settlement system of micro grid
  • Development of bidding function for generation resources of the market
Development of optimal operation function of real-time energy storage device
Period 2012.06.01 ~ 2012.10.31
Client LSIS
Contents
  • Establish real-time operation plan (ED and AGC) considering battery and heat storage tank in micro grid
Development of DR-UI program for users and managers of power demand resource trading system
Period 2012.02.01 ~ 2012.03.31
Client Byucksan Power., ltd.
Contents
  • Development of I/O management program for web-based daily market optimization
2011year
Establishment of optimal decision support system(IDSS)
Period 2011.10.01 ~ 2012.05.31
Client SK E&S
Contents
  • Development of SMP prediction system among optimal decision support system
  • Establishment of web-based development plan program reflecting the requirements of SK E&S
Development of optimal operation plan of low-cost energy storage device
Period 2011.08.22 ~ 2011.11.30
Client LSIS
Contents
  • Establish optimal operation plan considering battery and heat storage tank in micro grid
  • Development of optimum operation plan using commercial optimization solver and open optimization solver
Development of LA Client which includes ADR component module
Period 2011.05.16 ~ 2011.08.31
Client Byucksan Power., ltd.
Contents
  • Planning of a DR program interlocking system scenario and designing of the related user interface for LA Client.
  • Development of LA client
Development of the system for CBL Data collection and analysis
Period 2011.05.16 ~ 2011.08.31
Client Byucksan Power., ltd.
Contents
  • Designing the system for CBL calculation and analysis in conjunction with the operation system of real-time load resource.
  • Applying various CBL calculation methods and analysis of DR effect based on differences due to the various CBS calculation methods.
Planning of a power trade system scenario and designing of the user interface
Period 2011.03.14 ~ 2011.07.13
Client Byucksan Power., ltd.
Contents
  • Planning of an operation system scenario for the real-time load resource.
  • Planning and designing of the related user interface
2010year
Development of an optimized operation model for the smart renewable storage device
Period 2010.11.01 ~ 2011.04.30
Client LSIS
Contents
  • Development of an optimized operation model engine for the renewable facilities running in Jeju Smart Grid Test-bed
TAG DB management program
Period 2010.10.01 ~ 2010.12.31
Client Korea Power Exchange
Contents
  • Development of TAG DB management program
Developed Optimum Power Generation Plan Solution
Period 2010.08.01 ~ 2011.01.31
Client LSIS
Contents
  • Establishment of optimum UC considering generation facility and heat production facility in micro grid
  • Minimize cost and maximize profits considering network connection
  • Designed related UI
Development of an integrated operation system for Korean District Heating Corp.
Period 2010.04.15 ~ 2010.08.30
Client Korean District Heating Corp.
Contents
  • Development of an optimization engine to forecast the power market output and SMP
  • Development of the web-based user interface to maximize user convenience
Designing of the virtual power market for the business promotion of Smart Grid Test-bed
Period 2010.04.01 ~ 2012.03.31
Client Korea Electrotechnology Research Institute
Contents
  • Designing of the day-ahead market for Jeju Smart Grid Test-bed
  • Development of an optimization engine to run the day-ahead market
Development of an optimization function device for TOC connected power market
Period 2010.02.01 ~ 2011.05.15
Client LSIS
Contents
  • Development of an optimization engine focused on the market of Jeju Smart Grid Test-bed
2009year
Development of an integrated operation system for Korean District Heating Corp.
Period 2009.11.10 ~ 2010.08.25
Client Korean District Heating Corp.
Contents
  • Development of an optimization engine to forecast the power market output and SMP
  • Development of the web-based user interface to maximize user convenience
Development of an integrated computer model for generation scheduling and transaction analysis for the Korean power market
Period 2009.10.01 ~ 2010.09.30
Client Korea Southern Power Co., Ltd.
Contents
  • Development of a generation scheduling program in conjunction with load forecasting
  • Offers a short-term model based upon MIP and a long-term model based upon SUDP
  • Offers customization such as a simultaneous scenario execution function based on user request
Renovation of integrated system for power supply and demand
Period 2009.03.26 ~ 2009.09.25
Client Korea Power Exchange
Contents
  • Development of HITES
  • Forecasting the amount of fuel consumption and the generation cost by setting up monthly to yearly generation scheduling
  • Offers a function to modify maintenance schedule in conjunction with reserved power
Designing of an operation screen for the economic dispatch in Micro Grid
Period 2009.02.16 ~ 2009.08.15
Client LSIS
Contents
  • Designing of an operation screen for the economic dispatch in Micro Grid operation system
Development of an operation algorithm for economic dispatch and automatic control in Micro Grid
Period 2009.02.16 ~ 2009.08.15
Client LSIS
Contents
  • Offering the optimized resource distribution reflecting power demand and heat demand within Micro Grid
  • Automatic execution of ED based upon the duration set up by user
  • Providing an option of profit maximization module in conjunction with minimizing generation cost and network connectivity