RESEARCH PROJECT HISTORY
- Technical Consultation on Electricity Market Analysis for Feasibility Study for Coal Alternative LNG Complex Construction Project
- Period 2022.04.06~2022.12.31
- Client KEPCO Engineering & Construction Company, Inc.
-
Content
- Feasibility Study for LNG Complex Construction - Power Market Simulation
- (Southern development)Feasibility Study Service for LNG Acquisition Base Construction Project
- Period 2021.09.01~2022.02.28
- Client Deloitte Anjin LLC
-
Content
- Feasibility Study for LNG Acquisition Base - Power Market Simulation
- Power Market Analysis for New Power Point Survey and Preliminary Feasibility Study Service
- Period 2021.06.01~2021.12.28
- Client KEPCO Engineering & Construction Company, Inc.
-
Content
- New Power Point Survey and Preliminary Feasibility Study - Power Market Simulation
- Power market analysis and simulation for long-term operation combined power generation gas turbine upgrade feasibility study service
- Period ~2021.03.12
- Client KEPCO Engineering & Construction Company, Inc.
-
Content
- Construction Feasibility Study - Power Market Simulation
- Power market analysis for feasibility study of LNG alternative construction of Boryeong Units 5 and 6
- Period 2020.06.29~2021.10.31
- Client KEPCO Engineering & Construction Company, Inc.
-
Content
- Construction Feasibility Study - Power Market Simulation
- LNG acquisition base construction feasibility study Power market analysis service
- Period 2020.02.01 ~ 2020.05.31
- Client Byucksan Engineering Co., Ltd.
-
Contents
- Feasibility study and research for LNG base construction project
- RMS technology development for new renewable power supply expansion and power system stabilization
- Period 2019.12.01 ~ 2024.11.30
- Client Korea Energy Technology Evaluation and Planning
-
Contents
- Development of integrated control management system (RMS) technology such as new and renewable power output prediction, system evaluation and analysis, and control system for power system stabilization
- Research service to introduce new market system according to renewable energy increase
- Period 2019.10.04 ~ 2020.06.03
- Client Korea Electric Power Corp.
-
Contents
- Research and analysis of new market system introduction plan for renewable energy increase
- Investigation of new power plant development site and preliminary feasibility study - Economic feasibility review 3
- Period 2019.05.02 ~ 2019.06.30
- Client DoHwa, ltd.
-
Contents
- Survey and preliminary feasibility study of new power plant development site - Simulation of power market
- Feasibility study for Boryeong thermal power project - Simulation of electric power market
- Period 2019.04.12 ~ 2019.09.30
- Client DoHwa, ltd.
-
Contents
- Feasibility study of power generation business - Simulation of power market
- Estimation service for Ulsan power plant bio-conversion energy conversion business - Estimation of electricity demand supply
- Period 2019.04.12 ~ 2019.06.30
- Client DoHwa, ltd.
-
Contents
- Estimation of bio-energy conversion business feasibility analysis - Estimation of electricity demand supply
- A Study on the Application of Combination Characteristics of Combined Generator to Electric Power Market
- Period 2019.04.01 ~ 2020.03.31
- Client Korea Power Exchange
-
Contents
- Examination of cost modeling method for overseas complex generator
- Examination of cost modeling method of complex power generation equipment suitable for domestic
- Review of Performance Test Method of Composite Generator
- Presenting method of modeling complex generator in pricing plan and operational development plan
- Present bidding method and pricing method
- A Study on the Impacts of the Power System Market and the Countermeasure Plan
- Period 2018.10.15 ~ 2019.10.14
- Client Korea University(Industry-University Collaboration Foundation)
-
Contents
- A Study on the Impacts of the Power System Market and the Countermeasure Plan
- Research on environmental dispatching
- Period 2018.07.01 ~ 2019.06.30
- Client Samil PwC
-
Contents
- Research on environmental dispatching
- A case study on the use of overseas computer model to improve the reliability of supply and demand plan and feasibility study
- Period 2017.07.05 ~ 2018.10.04
- Client Korea Power Exchange
-
Contents
- Analysis of the reliability criteria of the electricity market in overseas major countries, application program, analysis of the function and application case of the supply-demand model
- Present appropriate model that can be applied under domestic electric power industry environment
- A Study on the Improvement of the Price Function of the Electricity Market Considering the Decentralization of the Power System
- Period 2017.03.01 ~ 2018.09.30
- Client Korea Power Exchange
-
Contents
- Study on the day-ahead, day and real-time electric power market system of overseas electric power market
- Deriving implications considering the decentralization of power system through comparison of the results of overseas case studies with domestic situation
- Suggestion on real-time and day-ahead market linkage structure suitable for domestic market and suggests consideration factors in market design
- Study on Establishment of Online Development Planning System Development Strategy
- Period 2016.06.17 ~ 2016.12.16
- Client Korea Power Exchange
-
Contents
- Analysis of operational development plan program reference model and operation status
- Study on improvement plan of operational development plan for real-time system operation
- Establish procedures for the next operational development plan
- Suggestion to establish the next operational development plan system
- Development long-term direction and execution strategy of Pumped storage plant
- Period 2016.02.17 ~ 2017.10.16
- Client Korea Hydro and Nuclear Co.
-
Contents
- Domestic and overseas power supply situation and forecast analysis
- Analysis of renewable energy development pattern
- The role and value analysis of pumped storage
- Development and simulation of economic analysis method for pumped-storage power generation
- Analysis of renewable energy development pattern
- Distribution power of collective energy cogeneration power generation through power system influence analysis
- Period 2016.02.15 ~ 2018.02.14
- Client Korea district heating and cooling association
-
Contents
- Review the scale of the minimum distributed power required for grid operation
- Review of power mix considering system constraints
- Review of cogeneration facility capacity considering technical characteristics of system
- Reviewing the direction of institutional improvement considering distributed power sources
- Feasibility study for Yongin Combined Cycle Power Generation Project
- Period 2015.03.19 ~ 2015.04.30
- Client DoHwa, ltd.
-
Contents
- Scenario generation considering future power market variables and economic evaluation through cost and settlement analysis
- A Study on the Introduction of Ancillary Service Market in the CBP System
- Period 2015.03.17 ~ 2016.03.16
- Client Korea Power Exchange
-
Contents
- Feasibility study of ancillary service market introduction
- Review of introduction of ancillary service market
- Analysis of the Impact of Capacity Compensation System Changes on Electric Power Industry to Achieve Resource adequacy
- Period 2015.01.19 ~ 2016.07.18
- Client Korea Power Exchange
-
Contents
- Proposal of Korean Capacity Market Basic Plan (draft)
- Analysis of the effect of the capacity compensation system change (capacity charge -> capacity market) on the electric power industry
- Capacity compensation system change (Capacity charge -> Capacity market) Identification of anticipated problems, Suggestions for resolution and transition plan
- Feasibility Study on Alternative 1 & 2 Block of Bun Dang Combined Cycle generators
- Period 2015.01.05 ~ 2015.06.30
- Client DoHwa, ltd.
-
Contents
- Power Market Simulation and Utilization Prediction
- Prediction of New Combined Cycle Power Utilization and Electricity Sales Revenue Forecast
- Influence Analysis of Korea District Heating Corporation by the Electricity Market Development Regulations in Korea
- Period 2014.10.02 ~ 2014.10.30
- Client Soongsil Univ.
-
Contents
- Influence Analysis of Korea District Heating Corporation by the Electricity Market Development Regulations in Korea
- Feasibility Study on Alternative 1 & 2 Block of Bundang combined cycle generator
- Period 2014.06.01 ~ 2014.09.30
- Client DoHwa, ltd.
-
Contents
- Power Market Simulation and Utilization Prediction
- Study on reduction of constrained-on and constrained-off cost to improve efficiency of power market operation
- Period 2014.05.23 ~ 2014.12.22
- Client Korea Power Exchange
-
Contents
- Analysis of causes of constrained-on and constrained-off cost using past settlement earnings
- Analysis of correlation between constrained-on and constrained-offinducing factors
- Establish a system for continuous monitoring of constrained-on and constrained-off and propose a utilization plan
- LG CNS Micro Grid Optimal Operation Algorithm Development
- Period 2014.05.01 ~ 2014.11.30
- Client LG CNS
-
Contents
- LG CNS Micro Grid Optimal Operation Algorithm Development
- Development of Integrated Optimal Algorithm for generation and transmission Plan Considering Uncertainty
- Period 2014.03.27 ~ 2015.03.26
- Client Pusan national Univ.
-
Contents
- Outline and characteristics analysis of overseas generation and transmission integration plan computerized model
- Development of Algorithm for Computational Modeling of Integrated Generation and Transmission System Suitable for Domestic and Application of Actual System
- Study on utilization of unused thermal energy in the metropolitan area
- Period 2014.03.26 ~ 2014.04.30
- Client Korea District Heating Corporation
-
Contents
- Analysis of price and power generation cost of power market in case power plant of Incheon area is replaced by cogeneration facility through simulation of power market
- A Study on the Appropriate Capacity Calculation and System Improvement of Demand Response Resources for Efficient Power Market Operation
- Period 2014.02.17 ~ 2015.05.16
- Client Korea Power Exchange
-
Contents
- Analysis of the potential capacity of overseas demand response resource and its utilization plan
- Establishment of estimation method of potential Demand Resource capacity and estimation method considering domestic environment
- Potential Capacity and Appropriate Capacity of Demand Response Resources for Domestic Power Market Application
- Improvement of electric power market system and activation of supply and demand plan for activation of demand response
- Research and development of economic operation program for optimum thermal linkage (SMP estimation)
- Period 2013.12.27 ~ 2015.06.26
- Client Korea District Heating Corporation
-
Contents
- Mid-term SMP forecasts through regression analysis and simulation techniques
- Accuracy comparison analysis by SMP prediction technique
- Development of ESS operating system and power market system for power system frequency control
- Period 2013.06.01 ~ 2016.05.31
- Client Korea Polytechnic Univ.
-
Contents
- Development of electric market operation system and compensation plan for ESS ancillary service transaction
- Carbon abatement city EMS engine
- Period 2013.03.06 ~ 2013.05.31
- Client KESRI
-
Contents
- Integrated control application optimization engine algorithm prototype
- A study on the method of reflecting demand resources in CBP market
- Period 2013.03.04 ~ 2014.03.03
- Client Korea Power Exchange
-
Contents
- Proposal of CBP market operation plan through economical demand resources and development resources
- Present Reliability Demand Resource and Economy Demand Integrated Operation Method of Demand Resources
- Suggestion of evaluation method of reduction amount and compensation of demand resources
- Simulation on facility investment in Youngdong Power Plant
- Period 2012.05.01 ~ 2012.05.30
- Client Korea Energy Economics Institute
-
Contents
- Analysis of profitability through power market simulation for six alternative at Youngdong Power Plant
- Study on improvement direction of operation and settlement of pumped storage power generation
- Period 2011.07.19 ~ 2011.09.18
- Client Independent Power Producer Association
-
Contents
- Validation of current settlement rule for pumped storage power generation
- Comparing Pumped storage real operation result with optimization result.
- Propose alternatives to bidding and settlement of pumped storage
- Development of optimal solution for seawater desalination
- Period 2011.03.01 ~ 2011.05.31
- Client Company W
-
Contents
- Development of seawater desalination optimization model
- Develop appropriate examples for simulation
- A Study on the Rational Implementation of the Restricted Price Bidding System in the Electricity Market
- Period 2009.04.01 ~ 2010.01.31
- Client Korea Power Exchange
-
Contents
- An analysis of the features of the current bidding system and the introduction of the limited price bidding system
- Development of specific methodology for limited price bidding