RESEARCH PROJECT HISTORY

2022year
Technical Consultation on Electricity Market Analysis for Feasibility Study for Coal Alternative LNG Complex Construction Project
Period 2022.04.06~2022.12.31
Client KEPCO Engineering & Construction Company, Inc.
Content
  • Feasibility Study for LNG Complex Construction - Power Market Simulation
2021year
(Southern development)Feasibility Study Service for LNG Acquisition Base Construction Project
Period 2021.09.01~2022.02.28
Client Deloitte Anjin LLC
Content
  • Feasibility Study for LNG Acquisition Base - Power Market Simulation
Power Market Analysis for New Power Point Survey and Preliminary Feasibility Study Service
Period 2021.06.01~2021.12.28
Client KEPCO Engineering & Construction Company, Inc.
Content
  • New Power Point Survey and Preliminary Feasibility Study - Power Market Simulation
Power market analysis and simulation for long-term operation combined power generation gas turbine upgrade feasibility study service
Period ~2021.03.12
Client KEPCO Engineering & Construction Company, Inc.
Content
  • Construction Feasibility Study - Power Market Simulation
2019year
Power market analysis for feasibility study of LNG alternative construction of Boryeong Units 5 and 6
Period 2020.06.29~2021.10.31
Client KEPCO Engineering & Construction Company, Inc.
Content
  • Construction Feasibility Study - Power Market Simulation
LNG acquisition base construction feasibility study Power market analysis service
Period 2020.02.01 ~ 2020.05.31
Client Byucksan Engineering Co., Ltd.
Contents
  • Feasibility study and research for LNG base construction project
2019year
RMS technology development for new renewable power supply expansion and power system stabilization
Period 2019.12.01 ~ 2024.11.30
Client Korea Energy Technology Evaluation and Planning
Contents
  • Development of integrated control management system (RMS) technology such as new and renewable power output prediction, system evaluation and analysis, and control system for power system stabilization
Research service to introduce new market system according to renewable energy increase
Period 2019.10.04 ~ 2020.06.03
Client Korea Electric Power Corp.
Contents
  • Research and analysis of new market system introduction plan for renewable energy increase
Investigation of new power plant development site and preliminary feasibility study - Economic feasibility review 3
Period 2019.05.02 ~ 2019.06.30
Client DoHwa, ltd.
Contents
  • Survey and preliminary feasibility study of new power plant development site - Simulation of power market
Feasibility study for Boryeong thermal power project - Simulation of electric power market
Period 2019.04.12 ~ 2019.09.30
Client DoHwa, ltd.
Contents
  • Feasibility study of power generation business - Simulation of power market
Estimation service for Ulsan power plant bio-conversion energy conversion business - Estimation of electricity demand supply
Period 2019.04.12 ~ 2019.06.30
Client DoHwa, ltd.
Contents
  • Estimation of bio-energy conversion business feasibility analysis - Estimation of electricity demand supply
A Study on the Application of Combination Characteristics of Combined Generator to Electric Power Market
Period 2019.04.01 ~ 2020.03.31
Client Korea Power Exchange
Contents
  • Examination of cost modeling method for overseas complex generator
  • Examination of cost modeling method of complex power generation equipment suitable for domestic
  • Review of Performance Test Method of Composite Generator
  • Presenting method of modeling complex generator in pricing plan and operational development plan
  • Present bidding method and pricing method
2018year
A Study on the Impacts of the Power System Market and the Countermeasure Plan
Period 2018.10.15 ~ 2019.10.14
Client Korea University(Industry-University Collaboration Foundation)
Contents
  • A Study on the Impacts of the Power System Market and the Countermeasure Plan
Research on environmental dispatching
Period 2018.07.01 ~ 2019.06.30
Client Samil PwC
Contents
  • Research on environmental dispatching
A case study on the use of overseas computer model to improve the reliability of supply and demand plan and feasibility study
Period 2017.07.05 ~ 2018.10.04
Client Korea Power Exchange
Contents
  • Analysis of the reliability criteria of the electricity market in overseas major countries, application program, analysis of the function and application case of the supply-demand model
  • Present appropriate model that can be applied under domestic electric power industry environment
2016year
A Study on the Improvement of the Price Function of the Electricity Market Considering the Decentralization of the Power System
Period 2017.03.01 ~ 2018.09.30
Client Korea Power Exchange
Contents
  • Study on the day-ahead, day and real-time electric power market system of overseas electric power market
  • Deriving implications considering the decentralization of power system through comparison of the results of overseas case studies with domestic situation
  • Suggestion on real-time and day-ahead market linkage structure suitable for domestic market and suggests consideration factors in market design
2016year
Study on Establishment of Online Development Planning System Development Strategy
Period 2016.06.17 ~ 2016.12.16
Client Korea Power Exchange
Contents
  • Analysis of operational development plan program reference model and operation status
  • Study on improvement plan of operational development plan for real-time system operation
  • Establish procedures for the next operational development plan
  • Suggestion to establish the next operational development plan system
Development long-term direction and execution strategy of Pumped storage plant
Period 2016.02.17 ~ 2017.10.16
Client Korea Hydro and Nuclear Co.
Contents
  • Domestic and overseas power supply situation and forecast analysis
  • Analysis of renewable energy development pattern
  • The role and value analysis of pumped storage
  • Development and simulation of economic analysis method for pumped-storage power generation
  • Analysis of renewable energy development pattern
Distribution power of collective energy cogeneration power generation through power system influence analysis
Period 2016.02.15 ~ 2018.02.14
Client Korea district heating and cooling association
Contents
  • Review the scale of the minimum distributed power required for grid operation
  • Review of power mix considering system constraints
  • Review of cogeneration facility capacity considering technical characteristics of system
  • Reviewing the direction of institutional improvement considering distributed power sources
2015year
Feasibility study for Yongin Combined Cycle Power Generation Project
Period 2015.03.19 ~ 2015.04.30
Client DoHwa, ltd.
Contents
  • Scenario generation considering future power market variables and economic evaluation through cost and settlement analysis
A Study on the Introduction of Ancillary Service Market in the CBP System
Period 2015.03.17 ~ 2016.03.16
Client Korea Power Exchange
Contents
  • Feasibility study of ancillary service market introduction
  • Review of introduction of ancillary service market
Analysis of the Impact of Capacity Compensation System Changes on Electric Power Industry to Achieve Resource adequacy
Period 2015.01.19 ~ 2016.07.18
Client Korea Power Exchange
Contents
  • Proposal of Korean Capacity Market Basic Plan (draft)
  • Analysis of the effect of the capacity compensation system change (capacity charge -> capacity market) on the electric power industry
  • Capacity compensation system change (Capacity charge -> Capacity market) Identification of anticipated problems, Suggestions for resolution and transition plan
Feasibility Study on Alternative 1 & 2 Block of Bun Dang Combined Cycle generators
Period 2015.01.05 ~ 2015.06.30
Client DoHwa, ltd.
Contents
  • Power Market Simulation and Utilization Prediction
  • Prediction of New Combined Cycle Power Utilization and Electricity Sales Revenue Forecast
2014year
Influence Analysis of Korea District Heating Corporation by the Electricity Market Development Regulations in Korea
Period 2014.10.02 ~ 2014.10.30
Client Soongsil Univ.
Contents
  • Influence Analysis of Korea District Heating Corporation by the Electricity Market Development Regulations in Korea
Feasibility Study on Alternative 1 & 2 Block of Bundang combined cycle generator
Period 2014.06.01 ~ 2014.09.30
Client DoHwa, ltd.
Contents
  • Power Market Simulation and Utilization Prediction
Study on reduction of constrained-on and constrained-off cost to improve efficiency of power market operation
Period 2014.05.23 ~ 2014.12.22
Client Korea Power Exchange
Contents
  • Analysis of causes of constrained-on and constrained-off cost using past settlement earnings
  • Analysis of correlation between constrained-on and constrained-offinducing factors
  • Establish a system for continuous monitoring of constrained-on and constrained-off and propose a utilization plan
LG CNS Micro Grid Optimal Operation Algorithm Development
Period 2014.05.01 ~ 2014.11.30
Client LG CNS
Contents
  • LG CNS Micro Grid Optimal Operation Algorithm Development
Development of Integrated Optimal Algorithm for generation and transmission Plan Considering Uncertainty
Period 2014.03.27 ~ 2015.03.26
Client Pusan national Univ.
Contents
  • Outline and characteristics analysis of overseas generation and transmission integration plan computerized model
  • Development of Algorithm for Computational Modeling of Integrated Generation and Transmission System Suitable for Domestic and Application of Actual System
Study on utilization of unused thermal energy in the metropolitan area
Period 2014.03.26 ~ 2014.04.30
Client Korea District Heating Corporation
Contents
  • Analysis of price and power generation cost of power market in case power plant of Incheon area is replaced by cogeneration facility through simulation of power market
A Study on the Appropriate Capacity Calculation and System Improvement of Demand Response Resources for Efficient Power Market Operation
Period 2014.02.17 ~ 2015.05.16
Client Korea Power Exchange
Contents
  • Analysis of the potential capacity of overseas demand response resource and its utilization plan
  • Establishment of estimation method of potential Demand Resource capacity and estimation method considering domestic environment
  • Potential Capacity and Appropriate Capacity of Demand Response Resources for Domestic Power Market Application
  • Improvement of electric power market system and activation of supply and demand plan for activation of demand response
2013year
Research and development of economic operation program for optimum thermal linkage (SMP estimation)
Period 2013.12.27 ~ 2015.06.26
Client Korea District Heating Corporation
Contents
  • Mid-term SMP forecasts through regression analysis and simulation techniques
  • Accuracy comparison analysis by SMP prediction technique
Development of ESS operating system and power market system for power system frequency control
Period 2013.06.01 ~ 2016.05.31
Client Korea Polytechnic Univ.
Contents
  • Development of electric market operation system and compensation plan for ESS ancillary service transaction
Carbon abatement city EMS engine
Period 2013.03.06 ~ 2013.05.31
Client KESRI
Contents
  • Integrated control application optimization engine algorithm prototype
A study on the method of reflecting demand resources in CBP market
Period 2013.03.04 ~ 2014.03.03
Client Korea Power Exchange
Contents
  • Proposal of CBP market operation plan through economical demand resources and development resources
  • Present Reliability Demand Resource and Economy Demand Integrated Operation Method of Demand Resources
  • Suggestion of evaluation method of reduction amount and compensation of demand resources
2012year
Simulation on facility investment in Youngdong Power Plant
Period 2012.05.01 ~ 2012.05.30
Client Korea Energy Economics Institute
Contents
  • Analysis of profitability through power market simulation for six alternative at Youngdong Power Plant
2011year
Study on improvement direction of operation and settlement of pumped storage power generation
Period 2011.07.19 ~ 2011.09.18
Client Independent Power Producer Association
Contents
  • Validation of current settlement rule for pumped storage power generation
  • Comparing Pumped storage real operation result with optimization result.
  • Propose alternatives to bidding and settlement of pumped storage
Development of optimal solution for seawater desalination
Period 2011.03.01 ~ 2011.05.31
Client Company W
Contents
  • Development of seawater desalination optimization model
  • Develop appropriate examples for simulation
2009year
A Study on the Rational Implementation of the Restricted Price Bidding System in the Electricity Market
Period 2009.04.01 ~ 2010.01.31
Client Korea Power Exchange
Contents
  • An analysis of the features of the current bidding system and the introduction of the limited price bidding system
  • Development of specific methodology for limited price bidding